Remodeling
Before, rough-in, inspection tag, final — on every wall.
Kitchens and baths move fast and get covered up. Jobsite keeps the rough plumbing and electrical photos behind the drywall where you can find them, and turns the week into a client update.
Sound familiar?
- "Did we get a photo before the drywall went up?"
- Clients who want updates but not a 40-message thread
- Inspection tags lost in the camera roll
What changes with Jobsite
Before/after pairs
Pick two photos, get a slider the client can drag. Pairs lead the completion report.
Progress reports by day
Each day is a section with its photos and the day's note. Send it from the truck.
Templates for kitchen and bath
Before each wall, demo, rough plumbing, rough electrical, inspection tags, insulation, drywall, tile, cabinets, counters, fixtures, final, punch list.
The remodel (kitchen / bath) checklist
Built in. Items tick themselves when the crew shoots the matching photo; the rest take one tap. Print it or download the PDF →
- Before (each wall)before ×4
- Demoprogress
- Rough plumbingprogress
- Rough electricalprogress
- Inspection tagsdocument
- Insulationprogress
- Drywallprogress
- Tile / floorprogress
- Cabinetsprogress
- Countersprogress
- Fixturesprogress
- Final (each wall)progress ×4
- Punch list resolvedprogress
Reports this trade sends
Completion: before/after pairs, final photos and a summary. Progress: a dated section per day with photos and the day's update. All PDFs carry your name, logo and page numbers, and the line "Originals preserved · verification hashes available on request".